Welcome to Koi Forum. Is this your first visit? Register
TuffX Glass
Page 8 of 24 FirstFirst ... 67891018 ... LastLast
Results 141 to 160 of 468
  1. #141
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Morning guys, very short but exciting update....

    https://youtu.be/sSY5qWGUrLY

  2. Thanks anne, freddyboy, RS2OOO, slickbe Thanked / Liked this Post
  3. #142
    Extreme Koi Member Rank = Adult Champion anne's Avatar
    Join Date
    May 2010
    Posts
    1,507
    Thanks / Likes
    3638
    Was that it...…………………... ……..

  4. Thanks freddyboy Thanked / Liked this Post
  5. #143
    Senior Member Rank = Supreme Champion freddyboy's Avatar
    Join Date
    Mar 2016
    Posts
    11,123
    Thanks / Likes
    17023
    That is some drum bazza

    Sent from my SM-G960F using Tapatalk

  6. Thanks Scamp Thanked / Liked this Post
  7. #144
    Couldn’t you have got a bigger one?

    GadgetBazza finally builds his pond!GadgetBazza finally builds his pond!


    Sent from my iPhone using Tapatalk

  8. Thanks freddyboy Thanked / Liked this Post
  9. #145
    Senior Member Rank = Grand Champion RoyLittle0's Avatar
    Join Date
    Jun 2016
    Location
    Derby
    Posts
    2,551
    Thanks / Likes
    4705
    Hope its big enough
    4600 Gallon Concrete Block and Fiberglass
    2100 mm x 710 mm Infinity Window 32mm thick glass
    2 x Aerated Bottom Drains and Skimmer
    Filtreau HiFlow 30 Drum Filter
    Bio Chamber - 140 litres K1
    Bakki Shower - 30 KG Sakura Far Infrared Media
    2 x 18,000 lh pumps
    Heated from house boiler through a heat exchanger
    Idealseal MS290

    My Pond Build

  10. Thanks freddyboy Thanked / Liked this Post
  11. #146
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Ha, sorry guys, was in a bit of a silly mood yesterday. Combination of it being my birthday and placing returns in the pond got me all excited!!

    so as part of placing pipes through walls in the filter area we needed to line up with the drum inlets / outlets. Since we don’t have the drums here yet (they arrive Monday), we had to mock one up from the online dimensions.

    67F72088-F5DD-4743-8626-028852251A35.jpg599E336A-C731-47DF-B6EA-F808262DA521.jpg

  12. Thanks freddyboy, slickbe Thanked / Liked this Post
  13. #147
    Extreme Koi Member Rank = Adult Champion anne's Avatar
    Join Date
    May 2010
    Posts
    1,507
    Thanks / Likes
    3638
    Belated Birthday Wishes for yesterday Gadgetbazza


  14. Thanks freddyboy, GadgetBazza, smartin Thanked / Liked this Post
  15. #148
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Ok, here’s today’s update. Been a bit frantic today. One of the mud walls caved in over night and pushed all the polystyrene wall out of shape, so first job of the day was to get all the clay out that had collapsed. Fortunately the steel held the polystyrene walls together and no damage done. Today’s job was to get the vertical braces in which straightened everything back up.

    after this we had a few more holes to core through the walls and steel for the last of the pipes. There should be a pipe in place for everything now!

    last job was to prepare the template for the glass wall so that it can be closed off after filling and most importantly to fix the location of the 5 x 25mm steel rebar that is going in the walls to form the posts for the glass. A bit more fiddling required with this in the morning before the concrete is pumped into the walls.

    so a busy but exciting day. Oh and the drums turned up too, although haven’t had a chance to look at them yet!

    14BA77C5-9398-4B7C-BA20-7447B6FCDA77.jpg

    and finally a bit of a rushed video showing progress from outside and inside the pond today!

    https://youtu.be/q6ItPqcro34

  16. Thanks anne, freddyboy Thanked / Liked this Post
  17. #149
    Extreme Koi Member Rank = Adult Champion anne's Avatar
    Join Date
    May 2010
    Posts
    1,507
    Thanks / Likes
    3638
    Is it finished yet...........................must be by now...…..if not......why not.....why are we waiting, why are we waiting.....

  18. Thanks freddyboy, GadgetBazza, smartin Thanked / Liked this Post
  19. #150
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Another update peeps.

    Some reasonable progress in general, but everything’s so bloody big it all takes forever to do!

    Had to postpone the fibreglassing that was due to start this week unfortunately, but it’s better to wait and get things right rather than rushing stuff. It’s not like the pond is the only part of the project that’s not finished!!!!

    had a bit of bad news on the pool too, but it will get sorted in due course.

    big thanks to Gaz at Aurora koi for supplying all the bits so far, I know it’s been a bit challenging at times, I appreciate your straight forward no nonsense honest service though mate.

    oh and the real drums have arrived but they’re still in their boxes!

    Apologies for the lockdown mullet, hopefully the hair dressers will open again soon!

    https://youtu.be/G8c3abdKAeM

  20. Thanks freddyboy, Gazkoi, anne Thanked / Liked this Post
  21. #151
    Senior Member Rank = Adult Champion Gazkoi's Avatar
    Join Date
    Feb 2020
    Location
    Tividale
    Posts
    1,654
    Thanks / Likes
    3235
    Great update mate

    Cheers

    Gaz
    Hobby and business gone but when you’re hooked you’re hooked.

    Always happy to help!!

  22. Thanks freddyboy, GadgetBazza, anne Thanked / Liked this Post
  23. #152
    Senior Member Rank = Supreme Champion freddyboy's Avatar
    Join Date
    Mar 2016
    Posts
    11,123
    Thanks / Likes
    17023
    Agree with gaz. Great update.
    Sorry to hear of the pool mate. As you say in video
    Company should take responsibility for that lol.
    Some pipework there lol. Nice one gaz.
    Fred

    Sent from my SM-G960F using Tapatalk

  24. Thanks Gazkoi, GadgetBazza, Scamp, anne Thanked / Liked this Post
  25. #153
    Senior Member Rank = Supreme Champion freddyboy's Avatar
    Join Date
    Mar 2016
    Posts
    11,123
    Thanks / Likes
    17023
    Quote Originally Posted by Gazkoi View Post
    Great update mate

    Cheers

    Gaz
    Nice one on the pipes and gear gaz
    Fred

    Sent from my SM-G960F using Tapatalk

  26. Thanks Gazkoi, GadgetBazza, anne Thanked / Liked this Post
  27. #154
    Senior Member Rank = Mature Champion smartin's Avatar
    Join Date
    Mar 2019
    Location
    East Sussex
    Posts
    2,464
    Thanks / Likes
    5204
    Wow GB - You have certainly done your home work on planning and prep mate, great project and has been quite a fascinating thread to follow, pond will look amazing, i look forward to it all being up and running then you can explain again how it all works lol.......insulation looks spot on, i have not seen that before.....
    2200 gallons,infinity window,
    Evolve 4k combi,spindrifter,
    2x20k pumps, BD,Skimmer,
    Shower, ASHP

  28. Thanks Gazkoi, freddyboy, GadgetBazza, anne Thanked / Liked this Post
  29. #155
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Quote Originally Posted by freddyboy View Post
    Agree with gaz. Great update.
    Sorry to hear of the pool mate. As you say in video
    Company should take responsibility for that lol.
    Some pipework there lol. Nice one gaz.
    Fred

    Sent from my SM-G960F using Tapatalk
    cheers Fred. Not official as yet but they are asking for the tilers to quote for the remedial work so sounds positive. They are also modifying the specification to include the changes for the remedial action so that we have the changes recorded for the guarantee. Bizarrely they haven’t seen this before with this kind of substrate and finish and have used this make up previously, however it transpires that this is the first outdoor pool they have specified with the insulated concrete forms, I think it’s used more commonly on indoor pool builds as the insulation meets the building regs for insulation an indoor pool. Funny how this information only comes to light afterwards! Still, they are a massive company and specialise in this stuff so I’m hoping we are protected. If I’d researched it and picked it all for myself like I have with pretty much everything else then that would definitely be hitting me in the wallet!

    Still can’t believe how much we’re spending on pipework and fittings. Gaz done me a cracking deal (and service) though so he’s looking after me. Got even more pipes on the pool but thankfully no 4” !!!

    i think that filter pit is going to get tight when stuff starts going in there!

  30. Thanks freddyboy, anne, Gazkoi Thanked / Liked this Post
  31. #156
    Extreme Koi Member Rank = Kyusai Scamp's Avatar
    Join Date
    Nov 2014
    Posts
    1,087
    Thanks / Likes
    1192
    Fantastic thread to follow Bazza, really cannot wait to see how it looks finished and landscaped. Credit to you for having the vision (and funds!) to create what I am sure will be one of the best Koi ponds out there! Keep the updates coming! Cheers

  32. Thanks freddyboy, GadgetBazza, anne, Gazkoi Thanked / Liked this Post
  33. #157
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Quote Originally Posted by smartin View Post
    Wow GB - You have certainly done your home work on planning and prep mate, great project and has been quite a fascinating thread to follow, pond will look amazing, i look forward to it all being up and running then you can explain again how it all works lol.......insulation looks spot on, i have not seen that before.....
    Thanks a lot. We probably spent a good 12 - 18 months on the design before we got stuck in. Before that we were planning on moving in here and getting cracking in the garden within a few months as the fish needed somewhere to go. Unfortunately. we had a severe flood 10 weeks after we moved in which meant that all our time and money for the garden ended up being invested in re-doing the house and the fish ended up in a vat and then eventually a fibreglass grow on tank. To be honest, it was probably a good thing as it allowed us to get a feel for the space before committing to anything.

    3 years on and we got started, it will be 1 year in the making since we "broke ground" at the end of July! Something tells me we won't be done by then, but hopefully not far off.

    The insulation is a great idea, I think its a very novel idea, hasn't taken off with the large house building companies, but certainly seems to be gaining some momentum. Insulation wise it's very good and for ease of build (as long as you don't want curves like we have) it's so easy to work with and quick too!

    I think it will be some time before we get the soft landscaping done and it will certainly take some time to establish, but I'll keep the updates coming.

  34. Thanks freddyboy, anne Thanked / Liked this Post
  35. #158
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Quote Originally Posted by Scamp View Post
    Fantastic thread to follow Bazza, really cannot wait to see how it looks finished and landscaped. Credit to you for having the vision (and funds!) to create what I am sure will be one of the best Koi ponds out there! Keep the updates coming! Cheers
    Thanks Scamp, you and I both!

    We're on the upside now, past the worst (hopefully) so apart from the considerable disappointment I had recently with the pool (which knocked my enthusiasm for a couple of days I must admit) everything is going in the right direction and no more significant destruction or digging is required!

    Will keep the updates coming, cheers.

  36. Thanks freddyboy, anne Thanked / Liked this Post
  37. #159
    Senior Member Rank = Supreme Champion freddyboy's Avatar
    Join Date
    Mar 2016
    Posts
    11,123
    Thanks / Likes
    17023
    Quote Originally Posted by GadgetBazza View Post
    cheers Fred. Not official as yet but they are asking for the tilers to quote for the remedial work so sounds positive. They are also modifying the specification to include the changes for the remedial action so that we have the changes recorded for the guarantee. Bizarrely they haven’t seen this before with this kind of substrate and finish and have used this make up previously, however it transpires that this is the first outdoor pool they have specified with the insulated concrete forms, I think it’s used more commonly on indoor pool builds as the insulation meets the building regs for insulation an indoor pool. Funny how this information only comes to light afterwards! Still, they are a massive company and specialise in this stuff so I’m hoping we are protected. If I’d researched it and picked it all for myself like I have with pretty much everything else then that would definitely be hitting me in the wallet!

    Still can’t believe how much we’re spending on pipework and fittings. Gaz done me a cracking deal (and service) though so he’s looking after me. Got even more pipes on the pool but thankfully no 4” !!!

    i think that filter pit is going to get tight when stuff starts going in there!
    Nice one mate. If I had a big company like the pool company. I would be bowing at your feet. To fix it free. Reason. Advertising
    Your build. Imagine when people see all that lot in photos.
    And want something similar. Ok maybe not on your build scale. But wow. What a seller that would be in a brochure. For building a pond or pool. Plus when it's all landscaped
    And matured. Some selling advert lol.

    Gaz helped me out as well with gear mate
    And considering the lock down.
    Gear was there pretty quick. And treatments. The 2 ochibas I got off him I am also well pleased.
    When they grow. They will be a good addition
    To the pond. Top man
    Fred


    Sent from my SM-G960F using Tapatalk

  38. Thanks anne, Gazkoi Thanked / Liked this Post
  39. #160
    Senior Member Rank = Nanasai GadgetBazza's Avatar
    Join Date
    Aug 2018
    Location
    Essex
    Posts
    657
    Thanks / Likes
    1289
    Quote Originally Posted by freddyboy View Post
    Nice one mate. If I had a big company like the pool company. I would be bowing at your feet. To fix it free. Reason. Advertising
    Your build. Imagine when people see all that lot in photos.
    And want something similar. Ok maybe not on your build scale. But wow. What a seller that would be in a brochure. For building a pond or pool. Plus when it's all landscaped
    And matured. Some selling advert lol.

    Gaz helped me out as well with gear mate
    And considering the lock down.
    Gear was there pretty quick. And treatments. The 2 ochibas I got off him I am also well pleased.
    When they grow. They will be a good addition
    To the pond. Top man
    Fred
    I can hope Fred! Bizarrely they are much bigger than any pool company, a multi national, multi billion dollar company that manufactures building materials / adhesive etc. I would think that covering the rectification cost on our project is a tiny drop in the ocean for them. Unfortunately however, I don't think my project will feature in any of their literature, simply not big enough! They supply to projects like Cross Rail / TFL etc.

    They actually called the tilers this morning and I ended up speaking with them, they came up with an offer to cover the cost of the materials. I told them that was unacceptable. Essentially they are offering to supply some silicon for the control joints and a tub of epoxy to replace what's being pulled out, maybe a few sheets of mosaic tiles and not covering the labour which will be the significant portion of any rectification. I've told them to go away and re-think it as it's not acceptable and we shall see what comes of that.

    Poor old Gaz, he's had the proper run around with some of my swept 90 degree bends. First their distributor sent elbows, then only 1 of 7 swept bends turned up because the courier company has lost the other box, whereabouts still unknown to this day! We returned the elbows with the same courier that delivered the swept bend and Gaz received a drill!!!! . Gaz has been great though, keeping me updated with the mistakes that people have made and where things are at. Ultimately, he ordered another set of bends which turned up the next day while the missing box is being located. Can't say fairer than that.

  40. Thanks anne, Gazkoi, freddyboy Thanked / Liked this Post
 

 
Page 8 of 24 FirstFirst ... 67891018 ... LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
All times are GMT +1. The time now is 02:41 PM. Online Koi Mag Forum
Powered by vBulletin® Version 4.2.3
Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.

vBulletin Improved By vBFoster® (Lite Version), © UltimateScheme, Ltd.