    Great diagrams Andre,Dave do you use s/s self tappers to clamp the two " L " together or small nuts and bolts or rivets?
    John

  2. Thanks Andre Asagi Thanked / Liked this Post
  3. #22
    Quote Originally Posted by john1 View Post
    Great diagrams Andre,Dave do you use s/s self tappers to clamp the two " L " together or small nuts and bolts or rivets?
    I used stainless steel self tappers mate but it wouldn't really matter I think.

    Sent from my BBB100-2 using Tapatalk
    Built not bought!

  4. Thanks john1 Thanked / Liked this Post
  5. #23
    Extreme Koi Member Rank = Mature Champion Andre Asagi's Avatar
    Join Date
    Apr 2014
    Location
    Tosche Station....Picking Up Some Power Convertors
    Posts
    2,377
    Thanks / Likes
    907
    I have some ss nuts/bolts. I thought you used rivets Dave? I spent ages seeking out ss rivets but to no avail plus i would've had to borrow a rivet gun. So went with nuts and bolts since i already had about 90 ss nuts...or bolts....the round ones.

    Anyway....Dave can you let me know the measurements please mate? Only rough. Doesn't need to be to the mm

    I need....from the last drawing, how far from top of sieve box to the top of the guttering. And at roughly what angle is the mesh?

    Once i have these measurements, i can begin to cobble it together.

    Thanks

  6. #24
    Quote Originally Posted by Andre Asagi View Post
    I have some ss nuts/bolts. I thought you used rivets Dave? I spent ages seeking out ss rivets but to no avail plus i would've had to borrow a rivet gun. So went with nuts and bolts since i already had about 90 ss nuts...or bolts....the round ones.

    Anyway....Dave can you let me know the measurements please mate? Only rough. Doesn't need to be to the mm

    I need....from the last drawing, how far from top of sieve box to the top of the guttering. And at roughly what angle is the mesh?

    Once i have these measurements, i can begin to cobble it together.

    Thanks
    Sorry for late reply have been mad busy.

    Not sure but do these images help you?

    DB

    Sent from my BBB100-2 using Tapatalk
    Built not bought!

  7. Thanks freddyboy, john1 Thanked / Liked this Post
 

 
Page 2 of 2 FirstFirst 12

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
All times are GMT +1. The time now is 02:59 PM. Online Koi Mag Forum
Powered by vBulletin® Version 4.2.3
Copyright © 2018 vBulletin Solutions, Inc. All rights reserved.

vBulletin Improved By vBFoster® (Lite Version), © UltimateScheme, Ltd.