Thread: New Pond Build

  1. #1
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367

    New Pond Build

    After much planning and design changes we have finally started the build.
    Size of dig was 6m x 3m x 1.2m After blocking it should be 5.5 x 2.5 x 1.5 to give around 4000 gallon pond.
    Synergy Combi 35 Drum.
    Two JBR Bottom Drains with air defusers.
    One JBR Skimmer

    Still unsure as to pump size for the returns an the size / location of them.

    Pics to follow.



  2. Thanks lee63, freddyboy, digger Thanked / Liked this Post
  3. #2
    Extreme Koi Member Rank = Grand Champion lee63's Avatar
    Join Date
    Oct 2014
    Location
    East riding of yorkshire
    Posts
    3,881
    Thanks / Likes
    3865
    Sounds good mate New Pond Build await some pics New Pond Build


    Sent from my iPhone using Tapatalk
    Its always a work in progress

  4. #3
    Senior Member Rank = Grand Champion voodoo_15_uk's Avatar
    Join Date
    Aug 2012
    Location
    York
    Posts
    4,526
    Thanks / Likes
    3287

    New Pond Build

    That's a good size. Looking forward to the progress pictures New Pond Build

    The superfish eco variable pumps are very good and also I've heard good things about the aqua forte variable pumps.

  5. Thanks lee63, freddyboy, Feline Thanked / Liked this Post
  6. #4
    Senior Member Rank = Supreme Champion freddyboy's Avatar
    Join Date
    Mar 2016
    Posts
    11,123
    Thanks / Likes
    17023
    Looking fwd to the build mate.

    Sent from my SM-G925F using Tapatalk

  7. Thanks lee63, Ajm Thanked / Liked this Post
  8. #5
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Location




    Patio being removed

    Digger and dump truck.




    Sent from my iPhone using Tapatalk

  9. Thanks lee63, Ajm, digger, Designer1, Feline Thanked / Liked this Post
  10. #6
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Spoil filled a 15 foot by 5 foot by 3 foot deep spot in garden



    Finished hole in ground



    As usual rain set in half hour after starting

    Started to square off sides tonight but rain stopped play.



    Sent from my iPhone using Tapatalk

  11. Thanks lee63, Ajm, Designer1, Feline Thanked / Liked this Post
  12. #7
    Extreme Koi Member Rank = Grand Champion lee63's Avatar
    Join Date
    Oct 2014
    Location
    East riding of yorkshire
    Posts
    3,881
    Thanks / Likes
    3865
    What a view mate New Pond Build love that spot youve got there.


    Sent from my iPhone using Tapatalk
    Its always a work in progress

  13. Thanks Ajm, RJW2012 Thanked / Liked this Post
  14. #8
    Senior Member Rank = Grand Champion andikoi's Avatar
    Join Date
    Aug 2013
    Location
    wakefield,west yorkshire
    Posts
    3,491
    Thanks / Likes
    3764
    looks great so far,keep the pics coming,i could do with the digger for my next build lol,dont fancy spades again haha,andi

  15. Thanks Ajm Thanked / Liked this Post
  16. #9
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Quote Originally Posted by lee63 View Post
    What a view mate New Pond Build love that spot youve got there.


    Sent from my iPhone using Tapatalk
    Its not that good in the snow.
    IMG_2242.jpg

  17. Thanks lee63 Thanked / Liked this Post
  18. #10
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Huston we have a problem.
    Local concrete company cannot get down lane to pump concrete.
    They can get the pump down but not the truck as there is a narrow section at the top of the lane which is just over 8 foot wide.
    It looks like its going to have to be mixed by hand. Not a job I'm looking forward to doing.

  19. #11
    Quote Originally Posted by Scorchio View Post
    Huston we have a problem.
    Local concrete company cannot get down lane to pump concrete.
    They can get the pump down but not the truck as there is a narrow section at the top of the lane which is just over 8 foot wide.
    It looks like its going to have to be mixed by hand. Not a job I'm looking forward to doing.
    Get a few mates round, grab a few beers and fire up the bbq


    Sent from my iPad using Tapatalk

  20. Thanks freddyboy Thanked / Liked this Post
  21. #12
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Have found a company that can get one of there mini mixers down. Maximum 3.5 cubic meters.
    Have to build a chute to get concrete to base but its better than mixing by hand.

    will get pipe work and drains in when rains stops.

  22. Thanks kelv0102, freddyboy Thanked / Liked this Post
  23. #13
    Senior Member Rank = Rokusai Scotts koi's Avatar
    Join Date
    Oct 2017
    Location
    Nottingham
    Posts
    352
    Thanks / Likes
    412
    Hi cant u hire a dump truck 4day cheaper than a pump. at around 100 a day drive it strait 2 the hole

  24. Thanks freddyboy Thanked / Liked this Post
  25. #14
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Quote Originally Posted by Scotts koi View Post
    Hi cant u hire a dump truck 4day cheaper than a pump. at around 100 a day drive it strait 2 the hole
    We would have to drive it down a very uneven lane, then down a large sloping grassed area and back up to pond.
    it was discussed when pond was dig and due to the nature of access we decided against it. More would end up slopping out than would reach the pond area.

    We have found a company with a mini mix that can get close.
    if you look on last pic there is a large gap in high wall ( level with digger in pic) which they can get to.
    Will have to make a chute to get concrete down to pond.

  26. #15
    Hi, That's a Stunning View your fish are going to have.
    Its looks like we are on the same curve, I've just had my 4th Grab truck arrive and only 1/3 of the way through the pond dig.
    What's your wall construction going to be like, and it render /Fibreglass or liner ?

    I have read on here that some are lining the pond wall with hard foam, Celotex type and then glassing over that- I guess just for insulation purposes, are you going to such lengths ?

    Good luck with it all in any case.
    Steve H

  27. Thanks freddyboy Thanked / Liked this Post
  28. #16
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    Hi
    Dense block on side for walls then hard foam and glassing.
    Not been able to do anything else as it’s not stopped raining.
    I was hoping to get DPM in and bottom drains but looking at forecast it’s going to have to wait until next weekend

    Richard

  29. Thanks freddyboy Thanked / Liked this Post
  30. #17
    Senior Member Rank = Rokusai Scotts koi's Avatar
    Join Date
    Oct 2017
    Location
    Nottingham
    Posts
    352
    Thanks / Likes
    412
    Quote Originally Posted by Scorchio View Post
    We would have to drive it down a very uneven lane, then down a large sloping grassed area and back up to pond.
    it was discussed when pond was dig and due to the nature of access we decided against it. More would end up slopping out than would reach the pond area.

    We have found a company with a mini mix that can get close.
    if you look on last pic there is a large gap in high wall ( level with digger in pic) which they can get to.
    Will have to make a chute to get concrete down to pond.
    a bigger dumper like a 3 instead of a 1 just an idea if all else fails!! Where theres a will theres a way u will overcum it sum how

  31. Thanks freddyboy Thanked / Liked this Post
  32. #18
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    I have managed to sort concrete for a week on Saturday.

    I have drawn up some plans for pipe work.
    Two drains, one skimmer all to drum
    returns are 2 inch pipe.
    I have put several returns in the plan, I can then alternate the flow around the pond eaxt week by opening and closing some returns.
    Please comment on return locations etc.

    Thanks

    PondRet1.pdf

    PondRet2.pdf

    PondRet3.pdf

  33. #19
    Senior Member Rank = Gosai Scorchio's Avatar
    Join Date
    Jan 2018
    Location
    Queensbury West Yorkshire
    Posts
    327
    Thanks / Likes
    367
    More progress bottom leved



    Shuttered and dpm in



    Bottom drains and pipe work in.


    Concrete due Saturday morning

    How do I make sure that the bottom drains do not get and concrete in them. Will tape over the top be strong enough when I tamp the concrete level.

    Thanks


    Sent from my iPhone using Tapatalk
    Last edited by Scorchio; 07-05-2018 at 08:45 PM.

  34. Thanks freddyboy Thanked / Liked this Post
  35. #20
    Quote Originally Posted by Scorchio View Post
    More progress bottom leved



    Shuttered and dpm in



    Bottom drains and pipe work in.


    Concrete due Saturday morning

    How do I make sure that the bottom drains do not get and concrete in them. Will tape over the top be strong enough when I tamp the concrete level.

    Thanks


    Sent from my iPhone using Tapatalk
    Stick some scrunched up polythene bags down them, tape another one over the top then stick an old broken slab or block over the hole.
    If anything goes inside just pick it off with a screwdriver. Don’t forget to take the bags out though else you’ll be cursing me when your drains are properly blocked up


    Sent from my iPhone using Tapatalk

  36. Thanks Ajm, freddyboy, RJW2012, lee63, Feline Thanked / Liked this Post
 

 
Page 1 of 15 12311 ... LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
All times are GMT +1. The time now is 04:43 AM. Online Koi Mag Forum
Powered by vBulletin® Version 4.2.3
Copyright © 2024 vBulletin Solutions, Inc. All rights reserved.

vBulletin Improved By vBFoster® (Lite Version), © UltimateScheme, Ltd.